<table id="wckv1"><bdo id="wckv1"></bdo></table>
<font id="wckv1"><sup id="wckv1"><tbody id="wckv1"></tbody></sup></font>
    <progress id="wckv1"><abbr id="wckv1"></abbr></progress>
    <center id="wckv1"><ruby id="wckv1"></ruby></center>
    <font id="wckv1"></font>
    久久中文字幕国产精品,久久精品熟女亚洲av艳妇,丰满人妻一区二区三区色,精品午夜福利短视频一区,乱子伦一区二区三区,久久一本人碰碰人碰,天天日夭天淫天天淫天天摸天天射 ,粉嫩蜜臀av一区二区绯色
    Current Location:Home > Product > High frequency induction heating series > High frequency heating machine

    2017-09-02 16:49:51

    Share
    • Share to WeChat Moments

    RAG-25KW high frequency heating machine

    • Description

    一、Industry application:

    RAG-25KW高頻加熱機

    1. Welding

    1) Welding of carbide tools. Such as turning tools, milling cutters, reamer.

    2) Welding of diamond bits. Such as diamond saw blades, abrasive tools, sawtooth welding. Welding of drill bits for prospecting, such as welding of a sub-drill and a claw bit.

    3) Composite welding of metal materials such as brass, copper, stainless steel, etc.

    2. Heat fitting and heat fusion equipment

    1) The heating of the motor rotor and the water pump shell, and the heating of the bearing sleeve. Thermal fusion of plastic handle of tableware, etc.

    2) Heating lamination of aluminum-plastic pipes, cables and wires; aluminum foil sealing used in food, beverage, and pharmaceutical industries, preheating expansion of metals, etc.

    3. Quenching

    Surface, inner hole, partial or overall quenching of various hardware tools, electric, hydraulic, pneumatic components, auto parts, motorcycle parts and other mechanical metal parts

    4. Annealing equipment

    It can perform overall or partial annealing treatment for various mechanical parts, and tensile annealing for stainless steel products within a diameter of 50

    1) Heat the metal material for stretching, molding, embossing, etc. Such as steel pipe stretching, pipe bending, head smashing; iron wire, steel wire heating nailing

    3) Heating and annealing metal materials. Such as steel pipe drawing, pipe bending; smashing head, iron wire, steel wire heating nails, stainless steel products

    5. Smelting

    1) Melting gold/copper/silver: 1-5kg

    2) molten steel/aluminum: 1-3kg

     

    2. Main features:

    1. Simple installation, only need to connect electricity and water to use, no need for special installation

    2. Easy to operate: you can learn in a few minutes

    3. Quick start: the heating can be started after the water is turned on

    4. Less power consumption: Compared with old-fashioned high-frequency equipment, it saves power, and the smaller the workpiece, the less power consumption

    5, the effect is good: the heating is very uniform, the temperature rises quickly, and the oxide layer is less.

    6. Adjustable power: adjustable output power

    7. Full protection: with overvoltage, overcurrent, overheating, water shortage and other alarm indications, and automatic control and protection

     

    3. Operation steps

    RAG-25KW高頻加熱機剪刀淬火

    1. Water: Start the water pump and observe whether the water flow at the water outlet is normal.

    2. Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

    3. Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

    4. Start: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

    5. Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

    6. Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

    7. Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch at the rear of the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


    4. Precautions for use

    RAG-25KW高頻加熱機

    1. In order to prevent electric shock, please ensure that the electrical specifications of the casing are reliably grounded.

    2. The removal and installation of the sensor must be carried out after the heating stops.

    3. Strictly implement the principle of water first and then electricity. Water shortage is strictly prohibited during the working process. The water quality and pressure of the cooling water inside the equipment and the sensor must meet the requirements of Table 2. In order to avoid blocking the cooling pipeline, if the water supply is supplied by a water pump, please install a filter at the water inlet of the water pump. The cooling water temperature should not be higher than 45°C, and the water flow rate should be 10T/h (softened water is recommended)

    4. The equipment should be protected from sunlight, rain, moisture, dust, etc. When repairing or maintaining the equipment is required, it must be done one hour after the power is turned off.

    5. In-machine cleaning method Blown with compressed air or blower every week. The circuit board is cleaned with a brush and then blown clean.

    6. Ordinary users should clean the waterway of the machine with a special descaling agent (available from our company) every 4 months. When the machine frequently alarms the water temperature, or observes that the water flow of the water outlet decreases significantly, it should be cleaned immediately.

    7. The sensor should be kept clean to prevent short circuit between turns.

    8. This device cannot use single-turn inductors. Otherwise, the device may be damaged due to too small inductive reactance. In special cases, please consult the manufacturer.

    9. When replacing the sensor, the contact surface between the sensor connection board and the transformer should be cleaned with sandpaper to maintain good electrical conductivity.

     

    5. Technical parameters

    model

    RAG-15KW


    model

    RAG-25KW

    power

    15KW


    power

     25KW

    Input Current

    23A


    Input Current

    32A

    Oscillation frequency

    30-100KHZ


    Oscillation frequency

    30-100KHZ

    Input voltage

    three phase220V


    Input voltage

    three phase380V

    molten gold

    1-3kg


    molten gold

    1-5kg

    volume(cm)

    42*20*36


    volume(cm)

    57*22*46

    weight(KG)

    20


    weight(KG)

    28

     

    6. Troubleshooting and troubleshooting

    Fault

    possible reason

    Solution

    After turning on the power switch, the "Power" indicator does not light up

    1 The panel power switch is in poor contact

    21P air circuit breaker trip

    3 Phase loss

    1 Close and open, repeat several times

    21P air open to send on

    3 Check the power supply voltage


    After stepping on the foot switch, the work light does not light up

    1 Foot switch lead off

    2 The AC contactor is not closed or the contact is poor

    3 Poor contact of the sensor

    1 Check the foot switch lead wire or AC contactor or sensor

    Adjust the panel power to the maximum, no current indication or the current is too small

    1 The number of turns of the inductor is too much or the load is too heavy

    2 sensor short circuit

    3 Poor contact at the sensor

    4 half bridge work

    1 Reconfigure the sensor

    2 reboot after separation and it works fine

    3 Grinding or pickling at joints

    4 Contact the manufacturer

    The workpiece cannot be heated after being placed

    1 The external power supply capacity is small or the wire is too thin

    2 phase loss

    3 The number of turns of the inductor is too much or the load is too heavy

    4 half bridge work

    1 Increase the power capacity

    2 Check the three-phase power supply

    3 Reconfigure the sensor

    4 Contact the manufacturer


    Overcurrent alarm

    1 The contact of the sensor is bad or short circuit

    2 The contacts of the AC contactor are in poor contact

    3 Too many or too few turns of the inductor

    4 ignition at the external power connector

    5 Poor contact of high-frequency cables

    6 Power board failure

    7 There is a spark inside

    8 The resonant transformer is bad

    1 Check the sensor, high frequency cable, external power supply

    2 Replace the AC contactor

    3 Reduce the number of inductor turns

    4 Check the power tube

    water pressure alarm

    1 The water pressure is too low

    2 limescale clogging

    3 The water pressure switch is broken

    1 Increase the water pressure

    2 Clean the limescale

    3 Replace the water pressure switch

    water pressure alarm

    1 The water temperature is too high

    2 The water flow is too small

    3 water pipe blockage

    4 Too much scale inside

    1 Change the cooling water

    2 Increase the water pump or water pressure

    3 Clean with descaling agent 1 40

    4 Replace the water temperature relay

    Recommended Products

    HOME About Us Product News Case Video Advantages Contact
    主站蜘蛛池模板: 亚洲一区精品视频在线| 先锋影音亚洲中文字幕av| a免费人日本网站| 国产精品拍在线天天更新| 亚洲区色欧美另类图片| 成人做爰黄A片免费看三区爱奴| 国产老熟妇露脸在线观视频| 中文在线а天堂| 无码乱人伦中文视| 国产精品人一区二区三区| 在线观看亚洲人成网址| 国产一区二区综合在线| 国产 av 高清| 亚洲国产欧美另类| 色噜噜精品一区二区三区| 性高朝久久久久久久| 国产在现在无码视频| 4hc44四虎www网站免费| 亚洲国内精品一区二区| 国产 丝袜 欧美 日韩 综合| 国产精品国三级国产专区| 少妇人妻综合久久中文| 国产成人精品午夜福麻豆报告| 吃奶呻吟打开双腿做受视频| 一区二区亚洲人妻精品| 国产麻豆激情图区在线| 人妻中文乱码在线网站| 亚洲精品日本久久久中文字幕| 老太婆性杂交欧美肥老太| 北岛玲亚洲一区二区三区| 亚洲图片自拍偷图区| 国产一区韩国主播| 国产亚洲精品线观看不卡| 无码专区久久综合久| 久久亚洲国产一区二区| 亚洲人成无码播放网站| 国产AV无码专区国产乱码| 人人摸人人搞人人透| 一区二区中文字幕久久| 亚洲精华国产精华精华好用吗| 色九月亚洲综合网|