<table id="wckv1"><bdo id="wckv1"></bdo></table>
<font id="wckv1"><sup id="wckv1"><tbody id="wckv1"></tbody></sup></font>
    <progress id="wckv1"><abbr id="wckv1"></abbr></progress>
    <center id="wckv1"><ruby id="wckv1"></ruby></center>
    <font id="wckv1"></font>
    久久中文字幕国产精品,久久精品熟女亚洲av艳妇,丰满人妻一区二区三区色,精品午夜福利短视频一区,乱子伦一区二区三区,久久一本人碰碰人碰,天天日夭天淫天天淫天天摸天天射 ,粉嫩蜜臀av一区二区绯色
    Current Location:Home > Product > Steel wire annealing > Aluminum bar forging furnace

    2020-07-20 17:48:44

    Share
    • Share to WeChat Moments

    Round steel forging diathermy equipment

    • Description

    圖片012.png

    Operation steps of round steel forging diathermy equipment and bar diathermy forging equipment

    1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

    2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

    3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

    4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

    5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

    6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

    7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


    Maintenance of round steel forging diathermy equipment and bar diathermy forging equipment

    When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

    高頻10.jpg


    Recommended Products

    HOME About Us Product News Case Video Advantages Contact
    主站蜘蛛池模板: 欧美乱人伦aⅴ精品| 亚洲中文字幕无码mv| 久久久久久精品免费无码无| 中文字幕无码永久| AV无码专区第一页| 亚洲嫩模喷白浆在线观看| 在线观看亚洲中文字幕| 体验区试看120秒啪啪免费| 无码无需播放器AV网站| 99久久久无码国产精品试看蜜桃| 色综合天天综合网国产成人网| 熟女一区二区不卡视频| 国产亚洲精品综合二区| 国产OL丝袜高跟秘书在线观看| 国产肥妇一区二区熟女精品| 亚洲爆乳WWW无码专区| 国产伦孑沙发午休精品| 无码综合天天久久综合网| 欧美男女爱爱视频| 一区二区在线观看成人午夜| 波多结野衣一区二区三区| 日韩精品一区二区午夜成人版| 精品一区二区成人码动漫| 国产性生大片韩国伦理三级免费观看性| 国产欧美色一区| 日韩视频无码中字免费观| 无码中文字幕a级毛片视频| 国产AV天堂亚洲国产AV| 欧美日韩亚洲国产综合乱| 日本一卡2卡3卡四卡精品网站| 看公狍和女人做爰| 午夜福利偷拍国语对白| 国产丶欧美丶日本不卡视频| 色综合天天综合狠狠爱_| 国产精品亚洲片夜色在线| 一日本道久久久精品国产| 人妻系列中文字幕精品| 日韩精品三区四区| 在线观看成人av天堂不卡| 久久福利青草免费精品| 免费成人网一区二区天堂|