<table id="wckv1"><bdo id="wckv1"></bdo></table>
<font id="wckv1"><sup id="wckv1"><tbody id="wckv1"></tbody></sup></font>
    <progress id="wckv1"><abbr id="wckv1"></abbr></progress>
    <center id="wckv1"><ruby id="wckv1"></ruby></center>
    <font id="wckv1"></font>
    久久中文字幕国产精品,久久精品熟女亚洲av艳妇,丰满人妻一区二区三区色,精品午夜福利短视频一区,乱子伦一区二区三区,久久一本人碰碰人碰,天天日夭天淫天天淫天天摸天天射 ,粉嫩蜜臀av一区二区绯色
    Current Location:Home > Product > IF induction series > Silicon controlled medium frequency forging furnace

    2020-07-21 16:25:04

    Share
    • Share to WeChat Moments

    Infrared temperature measurement forging furnace

    • Description

    Operation steps of infrared temperature measurement forging heating furnace

    1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

    2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

    3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

    4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

    5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

    6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

    7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


    Maintenance of Forging Furnace with Infrared Temperature Measurement

    When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

    高頻10.jpg



    Recommended Products

    HOME About Us Product News Case Video Advantages Contact
    主站蜘蛛池模板: 亚洲成人国产精品| 日本久久99成人网站| 饥渴少妇高潮视频大全| 国产精品久久影视| 亚洲精品在线无码| 国产在线流白浆视频| 驯服上司人妻HD中字日本| 欧美一区二区视频在线观看| 18禁白丝喷水视频WWW视频| 成人av毛片无码免费网站| 久久精品国产一区二区电影| 色综合久久久久综合一本到桃花网| 国产特黄特色a级在线视频| 精精国产XXX在线观看| 自慰无码一区二区三区| 国产午夜成人久久无码一区二区| 亚洲男人精品青春的天堂| 在线看无码的免费网站| 人人妻久久人人澡人人爽人人精品 | 91精品综合久久久久久久久久久| 亚洲国产亚洲综合在线尤物 | 国产精品一区中文字幕| 国产成人精品自在线拍| 久草视频精品在线| 91tv国产人成在线播放| 亚洲免费无码a集片| 国产精品大屁股白浆视频| 尤物国产在线精品一区| 四虎永久在线日韩精品观看| 国产一卡2卡3卡四卡精品网站| 丝袜精品国产香蕉在线| 特种兵的又粗又大好爽h| 国产一区二区不卡视频在线| 潮喷失禁大喷水无码| 国产精品白丝久久AV情趣网站| 精品国产一区二区亚洲人| 亚洲熟女少妇乱色一区二区| 中文字幕免费无码一区| 国产成人午夜精品5599| 国产日韩欧美一中文字宇幕| 亚洲无码又爽又刺激|